Finishing specification
 
 

Reinforced concrete foundations

 

Floors in polished cream marble effect ceramic tiles in living room, entrance hall, corridors and bedroo

 

Ceramic tiles in kitchen and bathrooms on floors and walls

 

Façade painted in double-layer color paint according the construction license and interiors painted in cream

 

Interior plumbing in PVC, according to current regulations, drainages in PVC to Egyptian regulations

 

Outer carpentry in aluminum or wood surrounds

 

Windows to be installed with single pane glass

 

Electrical installation, including electric socket points and light switches, cabling for interior and exterior
ceiling and wall lights installed, according to current regulations with protection mechanism installed

 

Pre-installation for digital T.V. platforms, telephone and broadband internet services

 

Sockets for telephone, television and data, according to the current regulations

  

Bathroom sanitary fittings in white porcelain (toilets, sinks, baths or showers) with mixer taps and
extractor fans shaver points etc

 

Interior carpentry with white lacquered doors with handles in chrome/ steel/ brass

  

Main front door reinforced and lacquered with security lock

  

Elevators in each individual block of the building

 

The road that joins the development to the main road will be installed and tarmac

 

 

   

 

 

What do you think about this project?


Enter Your Name

Enter Your Pass